← Back to All Projects
Gravity Pipeline

800 South Sewer Line

Payson · Utah

PVC Sewer Line Installed
2,008 Linear Feet
Location
Payson
County
Utah
Year
2022
Owner / Engineer
Payson City
800 South Sewer Line

Project Overview

Payson needed to replace and upsize a deteriorated sewer line near a new high school. VanCon installed 1,553 feet of 8-inch and 455 feet of 12-inch PVC sewer line, abandoned an existing sewer line, and installed five 60-inch diameter manholes. The streets contained complex existing utilities requiring extensive potholing. A concrete road was discovered buried in the main road during excavation. An unmarked high pressure gas line was identified due to a previous VanCon project in the area and required hand shoveling around it once it was exposed. A UDOT project was concurrent with the project creating scheduling challenges which VanCon mitigated by using the same asphalt company to reduce traffic interference by asphalting both areas at once. Groundwater required pumping throughout the project.

Project Highlights

  • 1,553 feet of 8-inch PVC sewer line installed
  • 455 feet of 12-inch PVC sewer line installed
  • Five 60-inch diameter manholes installed
  • Existing deteriorated sewer line abandoned
  • Unmarked high pressure gas line identified and hand-excavated
  • Coordinated asphalt work with concurrent UDOT project
  • Continuous groundwater dewatering throughout construction

Related Projects

Gravity Pipelines

Saratoga Springs Redwood Road Sewer Extension

Saratoga Springs · Utah County · 2019

VanCon used the jack and bore method to dig a 180-foot tunnel under Redwood Road and install 350 linear feet of 27-inch PVC sewer pipe. Both 48-inch and 60-inch manholes were installed. VanCon also installed 1,300 linear feet of 42-inch HOBAS sewer pipe and 800 linear feet of 42-inch PVC sewer pipe.

Jack & Bore Tunnel

180 Linear Feet

View Project →

Redwood Road Sewer
Gravity Pipelines

Redwood Road Sewer

Saratoga Springs · Utah · 2018

VanCon used the jack and bore method to tunnel a 42-inch, 180-linear-foot bore under Redwood Road. VanCon installed 360 feet of 27-inch, 50 feet of 30-inch and 780 feet of 42-inch PVC sewer pipe and 1,120 feet of 42-inch HOBAS pipe. Pipelines were 20 feet deep. Both 48-inch and 60-inch manholes were installed. VanCon installed culverts.

Sewer Pipe Installed

2,310 Linear Feet

View Project →

SVSD 11400 South Sewer Outfall Phase II
Gravity Pipelines

SVSD 11400 South Sewer Outfall Phase II

Salt Lake County · Salt Lake · 2012

VanCon installed a sewer outfall line from 11400 South to 11800 South. The project required 4,550 linear feet of 42-inch PVC sewer main at 10 to 20 feet deep, CCTV inspection, traffic control on UDOT roadway, and 84-inch manholes. A 60-inch jack and bore was required under Midas Creek. VanCon removed existing 10-inch PVC sewer main and reconnected 48-inch sewer laterals along the alignment. Bypass pumping was greater than 2,500 GPM. A large diversion structure was constructed at the intersection of 11800 South and 2700 West with stainless steel sluice gates.

42-inch PVC Sewer Main

4,550 Linear Feet

View Project →