← Back to All Projects
Pressure Pipeline

Draper Reuse Pipeline 2019 Project

Draper · Salt Lake County

34-inch High-Density Polyethylene Pipeline
2,200 Linear Feet
Location
Draper
County
Salt Lake County
Year
2020
Owner / Engineer
Draper City / Epic Engineering
Draper Reuse Pipeline 2019 Project

Project Overview

VanCon installed 2,200 linear feet of 34-inch HDPE pipeline along Bangerter Highway and directionally bored under UTA, Union Pacific railroad tracks, and the Jordan River to install 38-inch casing. VanCon also installed a valve vault with an air vac station.

Project Highlights

  • 2,200 feet of 34-inch HDPE pipeline along Bangerter Highway
  • Directional bore under UTA and Union Pacific railroad tracks
  • Directional bore under Jordan River with 38-inch casing
  • Valve vault with air vac station installed

Want to Build Projects Like This?

VanCon is hiring across Utah. Join the crews building the infrastructure our communities rely on.

Join Our Team