Springville Pressurized Irrigation Mainline Phase 2B
Springville · Utah County
- 30-inch PVC Irrigation Pipe
- 5,000 Linear Feet
- Location
- Springville
- County
- Utah County
- Year
- 2015
- Owner / Engineer
- Springville City / JUB
Project Overview
VanCon installed 5,000 linear feet of 30-inch PVC irrigation pipe, jack and bored under the railroad in two locations to install 42-inch steel casing (one bore tunneled under three railroad lines in a single bore and shored up an irrigation waterline that conflicted with the bore pit), and installed carrier pipe, fittings, valves, and drains. PR included scheduling with private landowners for land restoration, construction access, and staging. UDOT traffic control included setting up VMS boards, lane shifts, detour routing, railroad flagging, and signage. Agricultural land restoration, landscaping, sod, and sprinkler repairs completed the work.
Project Highlights
- 5,000 feet of 30-inch PVC irrigation pipe installed
- Jack and bore under railroad in two locations — 42-inch steel casing
- Single bore tunneled under three railroad lines simultaneously
- Irrigation waterline shored up conflicting with bore pit
- UDOT traffic control — VMS boards, lane shifts, detour routing, railroad flagging
- Agricultural land restoration, landscaping, sod, and sprinkler repairs
Related Projects
CUWCD Payson Spring Lake Reach Pipeline
Payson City · Utah County · 2024
Part of the CUPCA project to bring water from Strawberry Reservoir to southern Utah County, VanCon installed 19,800 feet of 60-inch culinary welded steel pipe with cathodic protection and 6,000 feet of HDPE irrigation pipe, improving regional water delivery capacity and system redundancy.
60-inch Welded Steel Pipe
19,800 Feet
View Project →
Spanish Fork South Field Metering & Canal Pipeline
Spanish Fork · Utah County · 2018
VanCon removed 1,600 linear feet of concrete canal lining, installed 7,300 linear feet of 48-inch and 36-inch Spirolite pipe, elbows, a 5x3-foot turnout box, a 9x3-foot cleanout box, removed the existing screening structure and replaced it with a new one, and cleaned the existing traveling screen.
48-inch & 36-inch Spirolite Pipe
7,300 Linear Feet
View Project →
Beaver Upper Telluride Penstock Pipeline Phase 1
Beaver · Beaver County · 2021
VanCon installed 900 linear feet of 30-inch welded steel penstock pipeline and rehabilitated an existing steel surge tank serving a high-pressure hydropower conveyance system. The work demanded precision welding, careful pressure-system coordination, and rigorous quality control to ensure structural integrity across a demanding mountain pipeline corridor built to withstand significant hydraulic forces.
30-inch Welded Steel Pipe
900 Linear Feet
View Project →