UDOT 6200 South Aqueduct Relocation

Salt Lake County · Salt Lake

Welded Steel Pipe Installed
3,000 Linear Feet
Location
Salt Lake County
County
Salt Lake
Year
2020
Owner / Engineer
UDOT / Bowen Collins & Associates
UDOT 6200 South Aqueduct Relocation

Project Overview

To relocate the 6200 South aqueduct, VanCon installed 1,000 linear feet of 78-inch and 2,000 linear feet of 36-inch welded steel pipe, a turn-out vault, jack and bored under Bangerter Highway, and installed 60 linear feet of 24-inch steel casing. VanCon also tied in to both 36-inch and 78-inch PCCP pipe.

Project Highlights

  • 1,000 feet of 78-inch welded steel pipe installed
  • 2,000 feet of 36-inch welded steel pipe installed
  • Turn-out vault constructed
  • Jack and bore under Bangerter Highway
  • 60 feet of 24-inch steel casing installed
  • Tie-ins to existing 36-inch and 78-inch PCCP pipe

Related Projects

SLC East West Conveyance Line
Pressure Pipelines

SLC East West Conveyance Line

Salt Lake City · Salt Lake County · 2022

To improve culinary water supply to the west side of Salt Lake City, VanCon installed a cast-in-place flow control valve vault and 3,300 feet of 48-inch welded steel pipe with a bore under the Jordan and Salt Lake Canal. VanCon also removed 350 feet of 8-inch sewer line, installed 58 feet of replacement sewer line, and replaced 100 feet of 4-inch waterline with a new 8-inch pipe. The pipeline also crossed a city golf course requiring coordination including installing the vault during the off season and high attention to detail in landscaping restoration. Bypass pumping was required.

48-inch Welded Steel Pipe

3,300 Linear Feet

View Project →

Woodland Hills Waterline Replacement
Pressure Pipelines

Woodland Hills Waterline Replacement

Woodland Hills · Utah County · 2021

VanCon helped design and then installed 21,077 feet of 8-inch PVC culinary waterline with valves and hydrants to replace a leaking waterline for the City of Woodland Hills. The waterlines were on steep slopes in a high fire hazard community with three emergency exits and narrow roads, and the schedule included winter weather. VanCon used new equipment to safely handle the slopes, kept a tight narrow work limit, and limited actively excavated areas to immediate construction to optimize access. During the CM/GC design stage of Phase 1, VanCon worked with the city budget to add an additional street to the project scope. The City later added two more streets with additional funding. Phase 1 was completed with Davis-Bacon wages.

8-inch PVC Waterline

21,077 Linear Feet

View Project →

Murray State Street Waterline Replacement
Pressure Pipelines

Murray State Street Waterline Replacement

Murray · Salt Lake · 2020

VanCon installed a waterline upgrade along State Street in Murray. The pipeline included 4,000 feet of 8-inch, 1,100 feet of 10-inch, and 2,300 feet of 12-inch ductile iron pipe and services.

Ductile Iron Pipe Installed

7,400 Linear Feet

View Project →