Pump Station

950 North Sewer Lift Station & Maintenance Building

Utah County · Utah County

Lift Station & Maintenance Building
2 Structures
Location
Utah County
County
Utah County
Year
2024
950 North Sewer Lift Station & Maintenance Building

Project Overview

VanCon constructed a new sewer lift station and maintenance building at 950 North, including all civil, mechanical, and electrical site infrastructure required for long-term pump station operations.

Project Highlights

  • New sewer lift station construction
  • Maintenance building construction
  • Full civil, mechanical, and electrical site work

Related Projects

DFCM USCF Scope A Pump Station
Pumps

DFCM USCF Scope A Pump Station

Utah · Utah County · 2020

VanCon excavated and built a sewer pump station with a wet well and pump room containing one 335 HP and two 85 HP dry-pit submersible pumps, a meter and pigging building, an electrical room, a bypass valve vault, and a pig retrieval vault. HDPE piping was used to connect all structures.

Primary Submersible Pump

335 Horsepower

View Project →

CUWCD Santaquin Booster Station & Pipeline
Pumps

CUWCD Santaquin Booster Station & Pipeline

Santaquin · Utah County · 2019

Originally designed for eight pumps, VanCon used the CM/GC process to create a plan Santaquin City accepted to reduce to four pumps while installing pump cans for four future pumps. Construction included a meter vault housing two 125 HP irrigation pumps and two 75 HP culinary pumps, cans for four future pumps, 1,000 feet of PVC culinary pipe, 300 feet of 48-inch reinforced concrete storm drain, a 16-inch manifold, a 10-inch culinary line, and a 48-inch RCP culvert for drainage. The pump station was connected with 1,100 feet of 18-inch PVC irrigation transmission pipeline, and the existing valve was automated for remote control from the pump station.

+ 4 Future Pump Cans

4 Pumps

View Project →

Logan Crockett Well Rebuild
Pumps

Logan Crockett Well Rebuild

Logan · Cache County · 2022

VanCon demolished an existing deteriorated well house, salvaged parts, built a new well house, and installed a 700 HP vertical turbine pump, flow meter, and chlorine gas injection. Construction involved high groundwater, digging into the side of an unstable hilltop, and a large volume of pedestrians. Due to design issues, VanCon became a design partner with the city, redesigning the retaining wall in a bunker-style vault to deal with the high groundwater and building dewatering wells and trenches.

Vertical Turbine Pump

700 Horsepower