CUWCD Santaquin Booster Station & Pipeline
Santaquin · Utah County
- + 4 Future Pump Cans
- 4 Pumps
- Location
- Santaquin
- County
- Utah County
- Year
- 2019
- Owner / Engineer
- CUWCD / Brown & Caldwell
Project Overview
Originally designed for eight pumps, VanCon used the CM/GC process to create a plan Santaquin City accepted to reduce to four pumps while installing pump cans for four future pumps. Construction included a meter vault housing two 125 HP irrigation pumps and two 75 HP culinary pumps, cans for four future pumps, 1,000 feet of PVC culinary pipe, 300 feet of 48-inch reinforced concrete storm drain, a 16-inch manifold, a 10-inch culinary line, and a 48-inch RCP culvert for drainage. The pump station was connected with 1,100 feet of 18-inch PVC irrigation transmission pipeline, and the existing valve was automated for remote control from the pump station.
Project Highlights
- CM/GC value engineering reduced 8 pumps to 4, saving capital cost
- Pump cans installed for 4 future pumps
- Two 125 HP irrigation pumps and two 75 HP culinary pumps
- 1,000 feet of PVC culinary pipe
- 300 feet of 48-inch reinforced concrete storm drain
- 1,100 feet of 18-inch PVC irrigation transmission pipeline
- 48-inch RCP culvert for drainage
- Existing valve automated for remote pump station control
Related Projects
950 North Sewer Lift Station & Maintenance Building
Utah County · Utah County · 2024
VanCon constructed a new sewer lift station and maintenance building at 950 North, including all civil, mechanical, and electrical site infrastructure required for long-term pump station operations.
Lift Station & Maintenance Building
2 Structures
View Project →
Logan Crockett Well Rebuild
Logan · Cache County · 2022
VanCon demolished an existing deteriorated well house, salvaged parts, built a new well house, and installed a 700 HP vertical turbine pump, flow meter, and chlorine gas injection. Construction involved high groundwater, digging into the side of an unstable hilltop, and a large volume of pedestrians. Due to design issues, VanCon became a design partner with the city, redesigning the retaining wall in a bunker-style vault to deal with the high groundwater and building dewatering wells and trenches.
Vertical Turbine Pump
700 Horsepower
View Project →
Salt Lake City 4th Avenue Well
Salt Lake City · Salt Lake County · 2022
VanCon rehabilitated an existing well, built a brick well house, installed a 400 HP vertical turbine pump, built a hypochlorite room with a tablet chlorination system, made connections to the existing storm drain, and installed 16-inch welded steel and 16-inch ductile iron pipe.
Vertical Turbine Pump
400 Horsepower
View Project →
Want to Build Projects Like This?
VanCon is hiring across Utah. Join the crews building the infrastructure our communities rely on.
Join Our Team