Alpine Watershed Protection Project
Alpine · Utah County
- Reinforced Concrete Pipe (36- to 84-inch)
- 3,356 Linear Feet
- Location
- Alpine
- County
- Utah County
- Year
- 2014
- Owner / Engineer
- Alpine City / Bowen Collins & Associates
Project Overview
Originally this project consisted of installing emergency watershed protection (EWP) measures including enlarging an irrigation pond, excavating and re-grading drainage channels, installing a box culvert, rip rap, and drainage piping, constructing a concrete flood wall, and installing a permanent silt fence. After a 100-year storm caused additional erosion, VanCon secured additional NRCS funding and installed a drainage levee with rip rap. When a 150-year storm wiped out most EWP measures, VanCon crews worked through the night clearing drainage channels and digging emergency detention ponds. VanCon ultimately installed 1,850 feet of 36-inch RCP, 865 feet of 48-inch RCP, 500 feet of 60-inch RCP, and 141 feet of 84-inch RCP, with large inlet/outlet structures, catch basins, a channelizing levee with riprap, seeding, and surface restoration.
Project Highlights
- 1,850 feet of 36-inch RCP installed
- 865 feet of 48-inch RCP installed
- 500 feet of 60-inch RCP installed
- 141 feet of 84-inch RCP installed
- Large inlet/outlet structures and catch basins
- Channelizing levee with riprap, seeding, and surface restoration
- Crews worked overnight during 150-year storm emergency response
Related Projects
CUWCD Spanish Fork Provo Reservoir Canal Pipeline — Orem Reach 1B
Orem · Utah County · 2016
The goal of the Orem Reach 1B project was to connect a water pipeline from the Strawberry Reservoir to a concrete structure at the mouth of Provo Canyon where the Owner can choose to discharge water into the Provo River or send water via the Provo River Aqueduct to various water agencies in Utah and Salt Lake Counties. Built on solid bedrock, the concrete hydraulic structure has many large pipe penetrations and angles that made concrete construction challenging. The project included 30 to 60-inch welded steel pipe and a traffic bridge over the Provo River with a 60-inch culvert. The project was completed 30 days early.
30- to 60-inch Welded Steel Pipeline
30 Days Early
View Project →
Vineyard RDA Lift Station 2
Vineyard · Utah County · 2014
This lift station, awarded to VanCon by the City of Vineyard, received awards from both APWA and ACI. The station required construction of a reinforced, cast-in-place 1,239 square-foot concrete sewer lift station 32-feet deep with a CMU building. The project included liquid-applied membrane, equipment installation, 1,100 linear feet of 36-inch piping, electrical work, pumps, a 275kW Generac 600A ATS generator, a mixer, and grating with a large staircase. The VanCon team completed the project despite high ground water requiring engineered dewatering operations and trench stabilization.
1,239-Square-Foot Concrete Lift Station
32 Feet Deep
View Project →
High Bench Booster Station
Sandy · Salt Lake County · 2013
Sandy awarded the contract to VanCon to construct a 43x40 foot pump station building, complete with welded steel manifolds, three 350 HP vertical turbine pumps, site improvements, installation and discharge piping, sewer, storm drain, electrical equipment, grating, stairs, and landscaping. The completed project received the Sandy Summit Award of 2013.
Vertical Turbine Pumps
3 × 350 Horsepower
View Project →
Want to Build Projects Like This?
VanCon is hiring across Utah. Join the crews building the infrastructure our communities rely on.