← Back to All Projects
Treatment Facility

CUWCD Ashley Valley WTP Chain & Flight Replacement

Ashley Valley · Uintah County

Chain & Flight Replacement
2 Basins
Location
Ashley Valley
County
Uintah County
Year
2018
Owner / Engineer
CUWCD / Brown & Caldwell
CUWCD Ashley Valley WTP Chain & Flight Replacement photo 1
CUWCD Ashley Valley WTP Chain & Flight Replacement photo 2
CUWCD Ashley Valley WTP Chain & Flight Replacement photo 3

Project Overview

VanCon demolished the deteriorated chain & flight mechanisms in both the North and South Basins and installed new devices which included shafts, chains & flights, motors & drives, return rails, installation and start-up of electrical and instrumentation. Existing handrails were modified and permanent ladders were added. Instrumentation, controls and weather shields were installed. CM/GC additions included an extra stainless-steel platform with a retractable ladder to improve basin access, and a baffle to protect the polymer sludge rakes from being destroyed by influent water.

Project Highlights

  • Chain & flight mechanism demolition and replacement in North and South Basins
  • New shafts, chains & flights, motors & drives, return rails
  • Electrical and instrumentation installation and start-up
  • Handrail modifications and permanent ladder additions
  • Instrumentation, controls, and weather shields installed
  • CM/GC: stainless-steel platform with retractable ladder added
  • CM/GC: baffle added to protect polymer sludge rakes

Related Projects

Springdale WTP
Treatment

Springdale WTP

Springdale · Washington County · 2018

VanCon removed the existing chemical room, chlorine room, and clearwell, and constructed a new water treatment plant with meter and control valve vault, office building, CMU block wall, and generator reinstallation.

Water Treatment Plant

1.67 MGD

View Project →

Sedimentation Basin Improvements
Treatment

Sedimentation Basin Improvements

Bluffdale · Salt Lake County · 2023

VanCon remodeled existing structures to increase the capacity and prolong the life of the Bluffdale water treatment sedimentation basins. VanCon removed deteriorated chain and flight and poured seismic reinforcing concrete walls inside two basins and two buttresses outside the basins. VanCon infilled around the troughs through the effluent wall of four basins. VanCon repaired clarifiers for basins 1 and 2. VanCon installed new chain and flight and replaced pumps for six basins. The work took place through an unexpectedly extra snowy winter, requiring ice chipping and snow removal almost daily.

Chain & Flight Replacement

6 Basins

View Project →

Gunlock Groundwater Treatment Plant
Treatment

Gunlock Groundwater Treatment Plant

St. George · Washington County · 2021

VanCon built a new groundwater treatment facility to filter arsenic, manganese, and iron from drinking water. The project included a treatment building with a chlorine gas feed system and ferric chloride dosing, and two parallel horizontal 4-cell pressure vessels with anthracite filter material with 6 MGD capacity. The project also included two backwash clarifiers, a pump station, a decant pump station, four 40-foot by 201-foot drying beds, 1,496 feet of 24-inch, 4,763 feet of 20-inch and 400-feet of 10 to 16-inch concrete lined ductile iron pipe.

Treatment Capacity

6 Million Gallons per Day

View Project →

Want to Build Projects Like This?

VanCon is hiring across Utah. Join the crews building the infrastructure our communities rely on.

Join Our Team