Project Overview

VanCon repaired and cleaned a seven-mile stretch of the Duchesne River, including removing and hauling off debris and trees out of the river channel, reshaping the banks of the river, installing embankment materials, excavating the reservoir basin, and constructing a sediment retention pond.

Project Highlights

  • 7-mile stretch of Duchesne River repaired and cleaned
  • Debris and trees removed and hauled from river channel
  • River bank reshaping and embankment material installation
  • Reservoir basin excavation
  • Sediment retention pond construction