Treatment Facility

Eagle Mountain WWTP Headworks

Eagle Mountain · Utah County

Grit Removal & Influent Screens
New Headworks
Location
Eagle Mountain
County
Utah County
Year
2024
Owner / Engineer
Eagle Mountain City / Aqua Engineering
Eagle Mountain WWTP Headworks

Project Overview

VanCon built a new headworks building and flow meter vault in an existing facility and installed influent screens, grit washing and removal equipment, a grit pump, slide gates, and connections to existing piping to divert influent lift station through the headworks building before supplying the ox ditch. VanCon's fabrication shop made the interior and exterior steel staircases and handrail and the channel supports and plates for the electrical room.

Project Highlights

  • New headworks building and flow meter vault
  • Influent screen installation
  • Grit washing and removal equipment
  • Grit pump and slide gates
  • Connections to existing piping for influent diversion
  • Interior and exterior steel staircases fabricated in-house
  • Handrail and channel supports fabricated in-house
  • Electrical room channel supports and plates

Related Projects

Salem WRF
Treatment

Salem WRF

Salem · Utah County · 2022

VanCon built a new wastewater reclamation facility with an operations building, a maintenance building, an electrical building, an influent pump station with mechanical and bypass bar racks, a headworks building with washer/compactor, grit classifier, and grit chambers, an anaerobic pre-selector with RAS pumps, a three-ring Orbal ditch, clarifiers, a process building with UV open channel disinfection, screw press, and alum feed systems, WAS pumps, a solids storage tank, odor control, and combustible gas monitoring. The water table onsite was 3 feet deep — vaults 15 to 20 feet deep required continual dewatering throughout the project.

Water Reclamation Facility

3 MGD

View Project →

PRWID WTTP Nutrient Upgrades
Treatment

PRWID WTTP Nutrient Upgrades

Price · Carbon County · 2024

VanCon remodeled equipment in the WWTP including RAS and WAS pumps, slide and stop gates, digester mixer draft tubes, fine air diffusers, mud valves, launder troughs, weir plates, headworks screen, a flow meter, draft tube repair, and electrical upgrades. The concrete in the sludge basins turned out to be heavily spalled once the basins were drained, so they were repaired by change order. The work required bypass pumping. The superintendent worked with the engineer to redesign the basement piping for efficiency and maintenance.

Wastewater Treatment Plant

Equipment Upgrade

View Project →

Springville WWTP 2020 Upgrades
Treatment

Springville WWTP 2020 Upgrades

Springville · Utah County · 2021

VanCon built a daft building with Huber daft equipment including RAS/WAS sludge pumps, polymer mixing/injection skids, HVAC, and new electrical room. VanCon also added onto the headworks building and installed chemical pumps, dosing skid, and chemical tank. VanCon also installed yard piping and completed renovations on the pump house.

Wastewater Treatment Plant Expansion

DAFT & Headworks

View Project →