Treatment Facility

Salem WRF

Salem · Utah County

Water Reclamation Facility
3 MGD
Location
Salem
County
Utah County
Year
2022
Owner / Engineer
Salem City / Forsgren
Salem WRF photo 1
Salem WRF photo 2
Salem WRF photo 3

Project Overview

VanCon built a new wastewater reclamation facility with an operations building, a maintenance building, an electrical building, an influent pump station with mechanical and bypass bar racks, a headworks building with washer/compactor, grit classifier, and grit chambers, an anaerobic pre-selector with RAS pumps, a three-ring Orbal ditch, clarifiers, a process building with UV open channel disinfection, screw press, and alum feed systems, WAS pumps, a solids storage tank, odor control, and combustible gas monitoring. The water table onsite was 3 feet deep — vaults 15 to 20 feet deep required continual dewatering throughout the project.

Project Highlights

  • Full wastewater reclamation facility — new construction
  • Operations, maintenance, and electrical buildings
  • Influent pump station with mechanical and bypass bar racks
  • Headworks building with washer/compactor, grit classifier, grit chambers
  • Anaerobic pre-selector with RAS pumps
  • Three-ring Orbal ditch and clarifiers
  • UV open channel disinfection, screw press, alum feed systems
  • Solids storage tank, odor control, combustible gas monitoring
  • Continual dewatering — water table 3 feet deep, vaults 15-20 feet deep

Related Projects

Eagle Mountain WWTP Headworks
Treatment

Eagle Mountain WWTP Headworks

Eagle Mountain · Utah County · 2024

VanCon built a new headworks building and flow meter vault in an existing facility and installed influent screens, grit washing and removal equipment, a grit pump, slide gates, and connections to existing piping to divert influent lift station through the headworks building before supplying the ox ditch. VanCon's fabrication shop made the interior and exterior steel staircases and handrail and the channel supports and plates for the electrical room.

Grit Removal & Influent Screens

New Headworks

View Project →

PRWID WTTP Nutrient Upgrades
Treatment

PRWID WTTP Nutrient Upgrades

Price · Carbon County · 2024

VanCon remodeled equipment in the WWTP including RAS and WAS pumps, slide and stop gates, digester mixer draft tubes, fine air diffusers, mud valves, launder troughs, weir plates, headworks screen, a flow meter, draft tube repair, and electrical upgrades. The concrete in the sludge basins turned out to be heavily spalled once the basins were drained, so they were repaired by change order. The work required bypass pumping. The superintendent worked with the engineer to redesign the basement piping for efficiency and maintenance.

Wastewater Treatment Plant

Equipment Upgrade

View Project →

Springville WWTP 2020 Upgrades
Treatment

Springville WWTP 2020 Upgrades

Springville · Utah County · 2021

VanCon built a daft building with Huber daft equipment including RAS/WAS sludge pumps, polymer mixing/injection skids, HVAC, and new electrical room. VanCon also added onto the headworks building and installed chemical pumps, dosing skid, and chemical tank. VanCon also installed yard piping and completed renovations on the pump house.

Wastewater Treatment Plant Expansion

DAFT & Headworks

View Project →

Want to Build Projects Like This?

VanCon is hiring across Utah. Join the crews building the infrastructure our communities rely on.

Join Our Team