Project Overview

VanCon built a new groundwater treatment plant to filter arsenic, manganese, and iron from drinking water. The project included a 5,808 square foot treatment building housing a 4-cell, 3 MGD pressure treatment vessel, a ferric chloride feed system, a chlorine generator feed system, a mezzanine, an electrical room, a control room, and a restroom. The plant included three 40x20-foot drying beds, a backwash tank, a decant pump station, a bypass valve vault, and a submersible pump wet well.

Project Highlights

  • 5,808 SF groundwater treatment building
  • 4-cell 3 MGD pressure treatment vessel
  • Ferric chloride and chlorine generator feed systems
  • Mezzanine, electrical room, control room, and restroom
  • Three 40x20-foot drying beds
  • Backwash tank and decant pump station
  • Bypass valve vault
  • Submersible pump wet well

Related Projects

CUWCD Ashley Valley WTP Chain & Flight Replacement
Treatment

CUWCD Ashley Valley WTP Chain & Flight Replacement

Ashley Valley · Uintah County · 2018

VanCon demolished the deteriorated chain & flight mechanisms in both the North and South Basins and installed new devices which included shafts, chains & flights, motors & drives, return rails, installation and start-up of electrical and instrumentation. Existing handrails were modified and permanent ladders were added. Instrumentation, controls and weather shields were installed. CM/GC additions included an extra stainless-steel platform with a retractable ladder to improve basin access, and a baffle to protect the polymer sludge rakes from being destroyed by influent water.

Chain & Flight Replacement

2 Basins

View Project →

Springdale WTP
Treatment

Springdale WTP

Springdale · Washington County · 2018

VanCon removed the existing chemical room, chlorine room, and clearwell, and constructed a new water treatment plant with meter and control valve vault, office building, CMU block wall, and generator reinstallation.

Water Treatment Plant

1.67 MGD

View Project →

Sedimentation Basin Improvements
Treatment

Sedimentation Basin Improvements

Bluffdale · Salt Lake County · 2023

VanCon remodeled existing structures to increase the capacity and prolong the life of the Bluffdale water treatment sedimentation basins. VanCon removed deteriorated chain and flight and poured seismic reinforcing concrete walls inside two basins and two buttresses outside the basins. VanCon infilled around the troughs through the effluent wall of four basins. VanCon repaired clarifiers for basins 1 and 2. VanCon installed new chain and flight and replaced pumps for six basins. The work took place through an unexpectedly extra snowy winter, requiring ice chipping and snow removal almost daily.