CUWCD Swenson Dam Modification
Springville · Utah County
- Radial & Overshot Gates
- Gate Replacement
- Location
- Springville
- County
- Utah County
- Year
- 2023
- Owner / Engineer
- Central Utah Water Conservancy District / Jacobs Engineering
Project Overview
VanCon replaced an existing dam in Hobble Creek running through Springville City with a 4-foot-wide radial gate, a 24-foot-wide overshot gate, a 31-foot-wide concrete channel grade control structure with measuring flume spanning the creek, and an ultrasonic meter. The water had to be diverted through a pipe during construction so native fish could thrive.
Project Highlights
- Existing Hobble Creek dam replaced
- 4-foot-wide radial gate installation
- 24-foot-wide overshot gate installation
- 31-foot-wide concrete channel grade control structure with measuring flume
- Ultrasonic meter installed
- Water diverted through pipe during construction to protect native fish
Related Projects
Cecret Dam Rehabilitation
Alta · Salt Lake County · 2024
VanCon poured a new concrete dam directly behind the face of the existing historic Cecret Lake dam — effectively replacing the structure without demolishing the original dam face. The high-alpine site at Alta was accessed through the ski slopes, adding logistical complexity to material delivery and the concrete pour.
Spillway · Embankment · Outlet
3 Systems
View Project →
Cecret Dam Revegetation
Alta · Salt Lake County · 2024
Revegetation and slope stabilization work following dam rehabilitation, restoring the natural landscape and preventing erosion on disturbed embankment areas.
Embankment Restoration
Slope Stabilization
View Project →
Carbon WCD Scofield Dam Outlet Modifications
Scofield · Carbon County · 2017
VanCon rehabilitated and modified the existing Scofield Dam by replacing the concrete crib wall, retaining wall, zone backfill material, and embankments. The top of the outlet and concrete spillway were redesigned and replaced with new concrete. The outlet floor and the walkway across the spillway were redesigned and replaced. VanCon designed and installed concrete slabs to address water spray from the outlet as well as a pedestrian access to the upstream staff gauge in the reservoir basin. Rock was removed from behind the existing rock slope wire mesh and the mesh was repaired at the top with rebar supports.
Full Concrete Reconstruction
Outlet & Spillway
View Project →