Young Living Farm Potable Water Systems and Bores
Mona · Juab County
- Concrete Water Storage Tank
- 250,000 Gallons
- Location
- Mona
- County
- Juab County
- Year
- 2016
- Owner / Engineer
- Young Living Farms / Stantec
Project Overview
VanCon built a 250,000 gallon concrete water storage tank with XYPEX coating and HDPE and PVC transmission and distribution pipelines. The water system included the installation of a chemical chlorine injection feed system as well as a 500 GPM well and the construction of a pump station building atop a valve vault. The pipeline to valve vault distance was 1,000 feet. Power was installed with new electrical lines to the location. VanCon bored under the highway to install 100 linear feet of 24-inch steel casing.
Project Highlights
- 250,000 gallon concrete water storage tank with XYPEX coating
- HDPE and PVC transmission and distribution pipelines
- Chemical chlorine injection feed system
- 500 GPM well installation
- Pump station building atop valve vault
- 1,000 feet of pipeline to valve vault
- New electrical lines to location
- 100 feet of bore under highway for 24-inch steel casing
Related Projects
Santaquin Zone 11 West PI System
Santaquin · Utah County · 2023
VanCon helped design and build a 3.28 MG concrete irrigation tank with an altitude vault, installed 7,000 feet of 24-inch ductile iron pipe, and built a pump station with two 200 HP vertical turbine pumps. Design assistance included mirroring the altitude vault and adjusting valves to navigate around existing infrastructure.
Concrete Irrigation Tank
3.28 Million Gallons
View Project →
Santaquin PI Tank
Santaquin · Utah County · 2019
Delivered under a CM/GC contract, VanCon built a 3.26 MG open-top irrigation water tank with connection to pressurized irrigation pipes, an access road, a riprap-lined drainage path, and 200 feet of new pressurized irrigation pipe. Through the CM/GC process, VanCon provided value engineering to replace a section of the ravine behind the tank with an underground pipe and two manholes, depositing excavated fill to create a level surface around the tank and enable vac truck access for future maintenance.
Open-Top Irrigation Tank
3.26 Million Gallons
View Project →
Tooele Bera 1 Million Gallons Reservoir
Tooele · Tooele County · 2023
VanCon constructed a 1 MG reinforced, buried concrete water storage tank with overflow and storm drain piping. The plans called for two layers of vapor barrier, complex underdrain and piping, and detailed activity sequencing. The project was completed during a cement shortage throughout the state of Utah. VanCon installed temporary fencing around the project due to frequent entry of local people onto the site and coordinated with adjacent contractors and their subcontractors constructing the new subdivision next to the tank.
Buried Concrete Reservoir
1 Million Gallons
View Project →
Want to Build Projects Like This?
VanCon is hiring across Utah. Join the crews building the infrastructure our communities rely on.
Join Our Team