← Back to All Projects
Treatment Facility

Cedar City Secondary Clarifier

Cedar City · Iron County

New Secondary Clarifier
4.8 MGD
Location
Cedar City
County
Iron County
Year
2021
Owner / Engineer
Cedar City / Stantec
Cedar City Secondary Clarifier photo 1
Cedar City Secondary Clarifier photo 2
Cedar City Secondary Clarifier photo 3

Project Overview

VanCon expanded an existing plant by building a new secondary clarifier with influent, effluent, return activated sludge, scum pipelines, a new splitter box, and two new return activated sludge pumps.

Project Highlights

  • New secondary clarifier construction
  • Influent and effluent pipelines
  • Return activated sludge pipelines
  • Scum pipelines
  • New splitter box
  • Two new return activated sludge pumps

Related Projects

Salem WRF
Treatment

Salem WRF

Salem · Utah County · 2022

VanCon built a new wastewater reclamation facility with an operations building, a maintenance building, an electrical building, an influent pump station with mechanical and bypass bar racks, a headworks building with washer/compactor, grit classifier, and grit chambers, an anaerobic pre-selector with RAS pumps, a three-ring Orbal ditch, clarifiers, a process building with UV open channel disinfection, screw press, and alum feed systems, WAS pumps, a solids storage tank, odor control, and combustible gas monitoring. The water table onsite was 3 feet deep — vaults 15 to 20 feet deep required continual dewatering throughout the project.

Water Reclamation Facility

3 MGD

View Project →

Eagle Mountain WWTP Headworks
Treatment

Eagle Mountain WWTP Headworks

Eagle Mountain · Utah County · 2024

VanCon built a new headworks building and flow meter vault in an existing facility and installed influent screens, grit washing and removal equipment, a grit pump, slide gates, and connections to existing piping to divert influent lift station through the headworks building before supplying the ox ditch. VanCon's fabrication shop made the interior and exterior steel staircases and handrail and the channel supports and plates for the electrical room.

Grit Removal & Influent Screens

New Headworks

View Project →

PRWID WTTP Nutrient Upgrades
Treatment

PRWID WTTP Nutrient Upgrades

Price · Carbon County · 2024

VanCon remodeled equipment in the WWTP including RAS and WAS pumps, slide and stop gates, digester mixer draft tubes, fine air diffusers, mud valves, launder troughs, weir plates, headworks screen, a flow meter, draft tube repair, and electrical upgrades. The concrete in the sludge basins turned out to be heavily spalled once the basins were drained, so they were repaired by change order. The work required bypass pumping. The superintendent worked with the engineer to redesign the basement piping for efficiency and maintenance.

Wastewater Treatment Plant

Equipment Upgrade

View Project →

Want to Build Projects Like This?

VanCon is hiring across Utah. Join the crews building the infrastructure our communities rely on.

Join Our Team