Central Davis Dewatering Facility
Davis County · Davis County
- Dewatering Facility
- 0.5 MGD
- Location
- Davis County
- County
- Davis County
- Year
- 2018
- Owner / Engineer
- Central Davis Sewer District / JUB
Project Overview
VanCon built a 4,134 square foot steel panel dewatering building from owner-supplied materials. Inside the building VanCon installed a duplex submersible lift station with associated piping which was then tied into an existing WAS building and screw pump influent lift station. Site grading, asphalt, electrical, SCADA and HVAC were installed. VanCon supplied and installed a stainless steel hopper and hopper platform, belt conveyor, progressive cavity pumps, bulk storage tanks, pressure washer with associated piping, and a screw press platform. Dewatering operations were maintained at facility throughout project with no impact on District's ability to meet UPDES discharge permit.
Project Highlights
- 4,134 SF steel panel dewatering building
- Duplex submersible lift station
- Connection to existing WAS building and screw pump influent lift station
- Site grading, asphalt, electrical, SCADA, and HVAC
- Stainless steel hopper and hopper platform
- Belt conveyor and progressive cavity pumps
- Bulk storage tanks and pressure washer
- Screw press platform
- Zero impact on UPDES discharge permit during construction
Related Projects
Salem WRF
Salem · Utah County · 2022
VanCon built a new wastewater reclamation facility with an operations building, a maintenance building, an electrical building, an influent pump station with mechanical and bypass bar racks, a headworks building with washer/compactor, grit classifier, and grit chambers, an anaerobic pre-selector with RAS pumps, a three-ring Orbal ditch, clarifiers, a process building with UV open channel disinfection, screw press, and alum feed systems, WAS pumps, a solids storage tank, odor control, and combustible gas monitoring. The water table onsite was 3 feet deep — vaults 15 to 20 feet deep required continual dewatering throughout the project.
Water Reclamation Facility
3 MGD
View Project →
Eagle Mountain WWTP Headworks
Eagle Mountain · Utah County · 2024
VanCon built a new headworks building and flow meter vault in an existing facility and installed influent screens, grit washing and removal equipment, a grit pump, slide gates, and connections to existing piping to divert influent lift station through the headworks building before supplying the ox ditch. VanCon's fabrication shop made the interior and exterior steel staircases and handrail and the channel supports and plates for the electrical room.
Grit Removal & Influent Screens
New Headworks
View Project →
PRWID WTTP Nutrient Upgrades
Price · Carbon County · 2024
VanCon remodeled equipment in the WWTP including RAS and WAS pumps, slide and stop gates, digester mixer draft tubes, fine air diffusers, mud valves, launder troughs, weir plates, headworks screen, a flow meter, draft tube repair, and electrical upgrades. The concrete in the sludge basins turned out to be heavily spalled once the basins were drained, so they were repaired by change order. The work required bypass pumping. The superintendent worked with the engineer to redesign the basement piping for efficiency and maintenance.
Wastewater Treatment Plant
Equipment Upgrade
View Project →
Want to Build Projects Like This?
VanCon is hiring across Utah. Join the crews building the infrastructure our communities rely on.
Join Our Team


