← Back to All Projects
Pump Station

Goshen Spring Development

Goshen · Utah County

Meter Vault & Drainage Channel
Spring Improvement
Location
Goshen
County
Utah County
Year
2021
Owner / Engineer
Goshen Town / Sunrise Engineering
Goshen Spring Development

Project Overview

VanCon improved an existing spring with a new meter vault, piping, and a drainage channel through removal of old piping, installation of new piping, reconfiguration of drain lines, and installation of washed gravel inside spring tunnel.

Project Highlights

  • New meter vault installation
  • Old piping removal and replacement
  • Drain line reconfiguration
  • Washed gravel installation inside spring tunnel
  • Drainage channel construction

Related Projects

950 North Sewer Lift Station & Maintenance Building
Pumps

950 North Sewer Lift Station & Maintenance Building

Utah County · Utah County · 2024

VanCon constructed a new sewer lift station and maintenance building at 950 North, including all civil, mechanical, and electrical site infrastructure required for long-term pump station operations.

Lift Station & Maintenance Building

2 Structures

View Project →

CUWCD Santaquin Booster Station & Pipeline
Pumps

CUWCD Santaquin Booster Station & Pipeline

Santaquin · Utah County · 2019

Originally designed for eight pumps, VanCon used the CM/GC process to create a plan Santaquin City accepted to reduce to four pumps while installing pump cans for four future pumps. Construction included a meter vault housing two 125 HP irrigation pumps and two 75 HP culinary pumps, cans for four future pumps, 1,000 feet of PVC culinary pipe, 300 feet of 48-inch reinforced concrete storm drain, a 16-inch manifold, a 10-inch culinary line, and a 48-inch RCP culvert for drainage. The pump station was connected with 1,100 feet of 18-inch PVC irrigation transmission pipeline, and the existing valve was automated for remote control from the pump station.

+ 4 Future Pump Cans

4 Pumps

View Project →

Logan Crockett Well Rebuild
Pumps

Logan Crockett Well Rebuild

Logan · Cache County · 2022

VanCon demolished an existing deteriorated well house, salvaged parts, built a new well house, and installed a 700 HP vertical turbine pump, flow meter, and chlorine gas injection. Construction involved high groundwater, digging into the side of an unstable hilltop, and a large volume of pedestrians. Due to design issues, VanCon became a design partner with the city, redesigning the retaining wall in a bunker-style vault to deal with the high groundwater and building dewatering wells and trenches.

Vertical Turbine Pump

700 Horsepower

View Project →