Project Overview

VanCon constructed a new pump station featuring two 75 HP pumps, butterfly valves, globe valves, flex connectors, and a flow meter. The facility was engineered for reliable, high-capacity water conveyance with precision flow control and serviceability built into every component — delivering durable infrastructure designed to perform across decades of continuous operation.

Project Highlights

  • Two 75 HP pump installation
  • Butterfly and globe valve installation
  • Flex connector installation
  • Flow meter installation
  • New pump station building construction

Related Projects

Cory Wride Pump Station
Pumps

Cory Wride Pump Station

Eagle Mountain · Utah County · 2023

VanCon constructed a pump station equipped with three 30 HP pumps, butterfly valves, and flow meters — providing balanced, redundant pumping capacity for dependable water system performance. The installation was completed with careful attention to hydraulic coordination and long-term maintainability, reinforcing VanCon's expertise in municipal pump station construction.

Pumps Installed

3 x 30 Horsepower

View Project →

950 North Sewer Lift Station & Maintenance Building
Pumps

950 North Sewer Lift Station & Maintenance Building

Utah County · Utah County · 2024

VanCon constructed a new sewer lift station and maintenance building at 950 North, including all civil, mechanical, and electrical site infrastructure required for long-term pump station operations.

Lift Station & Maintenance Building

2 Structures

View Project →

CUWCD Santaquin Booster Station & Pipeline
Pumps

CUWCD Santaquin Booster Station & Pipeline

Santaquin · Utah County · 2019

Originally designed for eight pumps, VanCon used the CM/GC process to create a plan Santaquin City accepted to reduce to four pumps while installing pump cans for four future pumps. Construction included a meter vault housing two 125 HP irrigation pumps and two 75 HP culinary pumps, cans for four future pumps, 1,000 feet of PVC culinary pipe, 300 feet of 48-inch reinforced concrete storm drain, a 16-inch manifold, a 10-inch culinary line, and a 48-inch RCP culvert for drainage. The pump station was connected with 1,100 feet of 18-inch PVC irrigation transmission pipeline, and the existing valve was automated for remote control from the pump station.